Projects
Built, photographed, and explained
Every project below includes what the scope was, what we found, and how long it took.
Showing 11 of 11 projects

Kitchen · Gilbert, AZ · 8 weeks
Two-Wall Kitchen Opened to the Family Room
A 1998 tract kitchen closed off from the living space. We removed a bearing wall, relocated the sink and range, and built a 10-foot island the family now eats every meal at.

Restaurant · Tempe, AZ · 16 weeks
3,200 SF Restaurant Buildout, Opened On Schedule
A second-generation space converted for a new concept: Type I hood, new grease interceptor, full dining room and bar. Opened the week the operator had already advertised.

Casita/ADU · Queen Creek, AZ · 19 weeks
640 SF Detached Casita for Aging Parents
A one-bedroom casita with a full kitchen and accessible bathroom, built on a septic lot with the leach field and well setbacks dictating placement.

Tenant Improvement · Chandler, AZ · 11 weeks
11,000 SF Office Reconfiguration, Staff In Place
An occupied office suite rebuilt in three phases around a working staff of 60, with glass conference rooms, new lighting and full data redistribution.

Multifamily · Phoenix, AZ · 5 months
96-Unit Renovation With Residents In Place
Unit turns, stair and railing repair, exterior paint and pool-area upgrades across an occupied 96-unit property, phased by building over five months.

Restaurant · Phoenix, AZ · 7 weeks
Restaurant Refresh and Expansion in Phoenix
A refreshed restaurant exterior with expanded storefront presence, updated signage, new canopies and site improvements — completed while the restaurant stayed open.

Bath · Chandler, AZ · 6 weeks
Primary Bath Rebuilt as a Curbless Suite
A cramped 1990s primary bath reconfigured into a curbless walk-in shower, floating double vanity and a layout that works for the next thirty years.

Whole House · Tempe, AZ · 16 weeks
Whole-House Renovation, Studs Out
A 3,400 SF home taken to the studs: new kitchen, three baths, repipe, panel upgrade, flooring throughout and a reconfigured great room.

Charter School · Maricopa, AZ · 6 weeks
Charter school four-classroom addition
A four-classroom addition with restroom accessibility upgrades and a reconfigured parent drop-off, delivered inside one period of performance.

Tribal Facility · Fort McDowell, AZ · 11 months
Health facility overhaul
Health facility overhaul while maintaining normal business hours including bathroom renovation, plumbing additions, tile upgrade, doors and paint.

Office · Mesa, AZ · 3 Months
Braces R Us Orthodontics
Orthodontic office buildout with treatment bays, sterilization and clinical support areas, delivered on schedule for a growing practice.
Residential
Book a Free Estimate
Tell us what you're planning. You'll get a walkthrough, an honest budget range, and a written scope before anyone talks about demo day.
KB1 Licensed, Bonded & Insured · Arizona's Most Referred General Contractor.
You'll know what's happening, what it costs, and what comes next.
